Up / do
Why the title is Up/Down? Does "these process" refer to the customer's operational process that is performed by the resource assets?
Up / do
Why the title is Up/Down? Does "these process" refer to the customer's operational process that is performed by the resource assets?
2015
Check if there is any updated version.
Checked the same title with other year - None @20201229
The costs of tests in accordance with the normal validity of the attestation defined in the procedural rules must be borne by the ASP.
Prequalification test costs should be borne by the ASP
technical and organisational requirements for the provision of primary control power
Search for where it is described. In particular the designated communication line. Where is it?
What is "Secondary Control"?
Negative power and positive power Positive Power equals more or less to "Negawatt"
No working fee
? No positve/negative, that means no commitment i.e. kW?
In FCR, we are talking about Power (performance), not Energy (provision)?
Or, does it mean that there in no kWh paid
Consumption and production in the electricity grid to be in balance at all times
Control Power / Control Energy
Balancing Energy
Distinction of Control Energy and Balancing Energy
Optional Downward Flexibility Management (ODFM
Is that the equivalent of Negawatt in Japan?