8 Matching Annotations
  1. Oct 2022
  2. Sep 2020
  3. Aug 2020
  4. Sep 2019
    1. Get the portable eyewash station from MONSAM Portable Sinks. They offer a wide range of portable sinks for health and beauty, these portable shampoo bowls are ideal for homes, barber shops, beauty salons and health care facilities.

    1. At MONSAM Portable Sinks, get a wide range of portable sinks. They offer portable changing stations for baby, day care portable sinks and toddler sinks. Their range of child-friendly portable sinks that are perfectly suited for preschool, kindergarten and child care centers.

    1. Monsam Enterprises, Inc. offers the best mobile hand wash stations. They have a huge variety of portable sinks, which includes 1, 2 ,3 or 4 Basin Mobile Sinks, Food and Coffee Cart Portable Sinks, Kitchen Portable Sink and much more. They also specialize in Custom Design Portable Sinks form last 18 years.

  5. May 2017
    1. Churchill Falls hydro-electric project
      The Churchill Falls hydro-electric project was inaugurated by Pierre Trudeau, the Canadian Prime Minister, on June 16, 1972. This hydro-electric plant was constructed between 1967 and 1975 and completed one year ahead of the predicted schedule. At the height of its construction, approximately 6,300 workers were present in the summer of 1970. The majority of construction occurred in the summer months, although construction continued year-round despite harsh conditions in Labrador where temperatures dipped to -21°C with a mean annual snowfall of 406 centimeters. The Churchill Falls power station is located in southern Labrador about 1,100 kilometers from an urban area. The Churchill Falls hydro-electric project was the largest hydro-electric project at the time, capable of generating 5,225 mW of electricity. It creates this energy by utilizing the water of the Churchill and Naskaupi Rivers which have a total catchment area of about 67,340 km2 combined. The underground power station is about 305 meters below ground. It uses eleven generators with a combined capacity of 5,225,000 kW. In order to utilize this harvested energy, large power lines capable of handling voltages up to 735 kV were put in place to transmit the energy from Churchill Falls to the Hydro-Quebec transmission system in the Manicouagan-Outardes hydro complex. The distance between these two stations is 606 kilometers. The energy from Churchill Falls was also transmitted via power lines to the Labrador City-Wabush area (Crabb, 1973). 
      

      References

      Crabb, P. (1973). Churchill Falls- The Costs and Benefits of a Hydro-Electric Development Project. Geography, 330-335.